2013-04-052013/519 Invitation to apply for qualification in procurement of 1-3 PSC of 420/245 kV 750 MVA 3-Phase Autotransformers (Svenska Kraftnät)
Qualification Documents can be downloaded in Mercell.se. Link: http://com.mercell.com/m/mts/Tender/38456105.aspx
OBS! This is a Pre-Qualification. Procurement of 1-3 psc of 420/245 kV 750 MVA 3-phase autotransformers, to be ready for operation (commissioning) between the beginning of 2015 and end of 2016
Find enclosed Pre-Qualification documents under 'files'
Submission of application, according to ch. 10 in the Qualification Document.
Questions regarding the pre-qualification documents shall be in …
Visa upphandlingen »
2012-12-20150 MVA power transformer to Kläppa (Fortum)
Fortum Distribution is installing a new transformer in an existing station outside Ljusdal , about 300 km north of Stockholm. The transformer will connect the national grid on 245 kV side and a region grid on 145 kV side.Coordinates:WGS 84 (lat, lon):N 61° 49.231, E 16° 7.234WGS 84 decimal (lat, lon):61.82052, 16.12057RT90:6856339, 1516629Electrical data: 150 MVA auto transformer, 245/145 kV.Cooling: To be optimized by the supplier. (water not allowed)Cooling equipment shall be hanged up on the …
Visa upphandlingen »
2012-12-032012/2078 Invitation to apply for qualification in procurement of three shunt reactors (TO Grundfors, Borgvik, and... (Svenska Kraftnät)
Qualification Documents can be downloaded in Mercell.se. Link: http://com.mercell.com/m/mts/Tender/36732907.aspx.
OBS! This is a Pre-Qualification. Procurement of 3-9 psc of 230 and 420 kV shunt reactors, to be ready for operation (commissioning) between spring of 2014 and spring of 2016.
Find enclosed RFP-documents under "files".
Submission of application, according to ch. 10 in the Qualification Document.
Questions regarding the pre-qualification documents shall be in writing to:
Hans Lundin, …
Visa upphandlingen »
2012-11-05Supply of power transformers to Vattenfall AB and all its affiliates (Vattenfall AB)
Power transformer with voltage range of 10 up to 400kV and sizes of 4-750MVA in accordance to the technical specifications from each region/company.
The total amount is approximatly 35-80 pcs, the exact amount will be specified in the RFQ-documents. The lots will also be specified in the RFQ-documents.
Visa upphandlingen »
2012-09-20Transformator 145/11.5 kV, 32/40 MVA (Falu Energi & Vatten AB)
Leveransen omfattar 1 st transformator 145/11.5 kV, 32/40 MVA inkl. leverans, uppställning och montage till driftfärdigt skick på befintligt fundament i station Falu Västra Falu Kommun, Dalarnas län, Sverige. Option på avhämtning inkl skrotning av befintlig transformator.
Visa upphandlingen »
2012-09-192012/55 - Elutrustning för inkommande fjärrvärme mot turbinbyggnad samt LSP ställverk i Block 3 inklusive matning... (Mälarenergi AB)
Leverantörens åtagande innefattar ett funktions åtagande för införande av: - 2 st motordrifter med frekvensomriktare samt tillhörande transformatorer till fjärrvärmepumpar -.
1st trelindnings-transformator, 2 st ställverk (0,4kV och
0,69kV) och utrustning till motordrifter för kyl och sjövattenpumpar I leverans skall montage, igångkörning och alla tjänster som erfordras ingå, för att anläggningen skall vara komplett och väl fungerande. Utrustning skall integreras mot block 6 vilket innebär att all …
Visa upphandlingen »
2012-05-31Projektleveranser/Förrådsleveranser av elverksmateriel 2012 (Borås Elnät AB)
Allmän information.
Borås Elnät AB inbjuder härmed intresserade leverantörer att lämna anbudsansökan på "Projektleveranser/Förrådsleveranser av elverksmateriel 2012".
Borås Elnät AB är ett av Borås Stad kommunägt bolag som har till huvuduppgift att trygga och utveckla infrastrukturen för el- och kommunikationsnät inom Borås Stad. Borås Elnät AB omfattas av offentlighetsprincipen.
Upphandlingsförfarande.
Denna upphandlingen genomförs som förhandlad upphandling enligt lagen (2007:1092) om upphandling inom …
Visa upphandlingen » Nämnda leverantörer:Ahlsell Sverige AB
2011-12-15Upphandling av Spänningstransformatorer 220 och 400 kV (Svenska Kraftnät)
Vid fortlöpande kontroller av Energimätsystem har Svenska Kraftnät identifierat behov av utbyten av Spänningstransformatorer i såväl 220- som 400 kV-stationer. Denna förfrågan avser 28 st. 220 kV och 15 st. 400 kV enpoliga spänningstransformatorer. Kvalificeringsunderlaget hämtas i Mercell. Länk: http://se.mercell.com/m/mts/Tender/31210005.aspx. Därutöver önskas en option avseende leverans av 220 kV samt 400 kV enpoliga spänningstransformatorer som skall kunna avropas löpande med en eller flera enheter …
Visa upphandlingen »
2011-11-10Projektleveranser/Förrådsleveranser av elverksmaterial (Borås Elnät AB)
Upphandlingen omfattar leveranser av elverksmateriel för nätbyggnation, transformatorer och passiv optomateriel. Vid större driftstörningar har Köparen behov av extraordinära insatser av leveranser vid såväl ordinarie arbetstid som under lör-, sön- och helgdagar året runt och under 24 timmar om dygnet genom att Säljaren på kort varsel kan tillhanda materiel inom 6 timmar efter beställning.
Visa upphandlingen »
2011-10-28Online equipment for power transformers (Vattenfall Eldistribution AB)
Delivery of 15pcs of online meassurement equipment for power transformers. That includes some services at the sub station.
Exact delivery place will be specified in the RFQ document.
The equipment must be maintenance free and shall be able to meaussure Hydrogen (H2),Carbon Monoxide (CO), Carbon Dioxide (CO2), Methane (CH4), Acetylene (C2H2), Ethane (C2H6), Ethylene (C2H4), Water (H2O), Oxygen (O2). The equipment must be able to connect to our collection system.
Visa upphandlingen »
2011-09-22Supply of power transformers (Vattenfall AB)
Power transformer with voltage range of 84 up to 400 kV and sizes of 10-750 MVA. And according to the technical specifications from each region/company.
The total amount is approximatly 35-45 pcs, the exact amount will be specified in the RFQ. The lots will also be speicified in the RFQ.
Visa upphandlingen »
2011-05-13Krafttransformatorer (Kraftringen Nät AB)
Kraftringen Nät AB har för avsikt att upphandla trefas oljeisolerade krafttransformatorer för elnätsdistribution/lokal elproduktion inom Skåne län med nedan angivna konstruktionsspänningar och ungefärliga storlekar:
— 1 st. 24/24 kV 8 MVA med leverans senast 2:a kvartalet 2012,
— 1 st. 145/12 kV 30 MVA med leverans 4:e kvartalet 2012,
— 1 st. 145/12 kV 40 MVA med leverans 1:a kvartalet 2013 samt option på, med beställning senast 1/4 2012,
— 1 st. 145/12-24 kV 40 MVA med leverans 4:e kvartalet 2013.
Visa upphandlingen » Nämnda leverantörer:Helmerverken Holding AB
2011-05-13Lot A-17 transformers for a new combined heat and power plant (Brista B2) (AB Fortum Värme samägt med Stockholm Stad)
1 pc Grid Power Step-up transformer, 100 MVA, 70/22 kV, OFAF, including surge arrestors and on-load motor-operated tapchanger
1 pc. Generator Power Step-up transformer, 30 MVA, 22/10,5 kV, OFAF
The transformers shall be installed in outdoor transformer cells.
The scope of supply includes:
— Transformers as per above delivered, installed and commissioned at site,
— FAT/SAT,
— Detailed engineering,
— Documentation.
The transformers are scheduled to be delivered to site approx. 2012-10-12 and commissioned …
Visa upphandlingen »
2011-04-05Lot 5 Högspänningsutrustning (Lunds Energikoncernen AB (publ))
Lunds Energikoncernen AB (Koncernen) ägs av ett holdingbolag som i sin tur ägs av 4 kommuner: Lund 82,4 %, Eslöv 12,0 %, Hörby 3,5 % och Lomma 2,1 %. Kraftringen Produktion AB är ett dotterbolag till Koncernen och försörjer bl.a. tätorterna Lund, Lomma och Eslöv med fjärrvärme. Den totala fjärrvärmeproduktionen inom området är drygt 1 000 GWh. Produktionen är idag baserad på geotermi- och avloppsvärmepumpar, returträ och biobränsle, gasturbin, elpannor samt naturgas- och oljeeldade hetvattenpannor.
Inom …
Visa upphandlingen »
2011-01-31Upphandling av transformatorstation Anneberg 400/200 kV, Danderyd (Svenska Kraftnät)
Svenska Kraftnät har på regeringens uppdrag utrett hur stam- och regionnäten för el i Stockholms län kan utformas i framtiden. Ett förslag till utformning som långsiktigt säkrar regionens elförsörjning har tagits fram.
Ryggraden i Stockholms nuvarande elförsörjning är ett 400 kV nät med sträckningen Forsmark-Enköping-Södertälje-Södertörn. I förslaget till framtida nät byggs en 400 kV förbindelse från norra Stockholm till Södertörn som skapar en 400 kV ring runt staden.
Den första etappen av den nya 400 …
Visa upphandlingen »
2011-01-24Upphandling av nytt ställverk bräcke 200 kV (Svenska Kraftnät)
Svenska Kraftnät skall ta emot en anslutning för vindkraftpark på 200 kV. I denna upphandling ingår att uppföra ett nytt kopplingställverk på ledning vid ledning KL1 Krångede Horndal 2 mil öster om Bräcke. Stationen ska bestå av 3 st. ledningsfack. Uppdraget skall utföras enligt ABT 06 och omfattar bl.a. komplettering med och justering av:
— markåtgärder och marklinenät,
— vägar,
— nya ledningsfack,
— fundament för stolpar, portaler och ställverksapparater,
— stolpar, portaler och ställverksapparater,
— …
Visa upphandlingen »
2011-01-24Stationsåtgärder i Hällby 200kV ställverk (Svenska Kraftnät)
Svenska Kraftnät skall ta emot anslutning för 2 vindkraftparker på 200 kV.
I denna upphandling ingår i huvudsak att komplettera befintligt 200 kV ställverk i Hällby med 2 nya ledningsfack och förnya 2 ledningsfack.
Uppdraget skall utföras enligt ABT 06 och omfattar bl.a. komplettering med och justering av:
— markåtgärder och marklinenät,
— vägar,
— förlängning av samlingsskenor,
— nya ledningsfack,
— fundament för stolpar, portaler och ställverksapparater,
— stolpar, portaler och ställverksapparater,
— …
Visa upphandlingen »
2011-01-17Krafttransformator (Härnösand Elnät AB)
Härnösand Elnät AB avser att ersätta en gammal transformator 10MVA från 1987 med en ny 10MVA transformator.
Stationen är belägen i Västby (Ramvik), Härnösands kommun, Västernorrlands län.