Lot A-17 transformers for a new combined heat and power plant (Brista B2)
1 pc Grid Power Step-up transformer, 100 MVA, 70/22 kV, OFAF, including surge arrestors and on-load motor-operated tapchanger
1 pc. Generator Power Step-up transformer, 30 MVA, 22/10,5 kV, OFAF
The transformers shall be installed in outdoor transformer cells.
The scope of supply includes:
— Transformers as per above delivered, installed and commissioned at site,
— FAT/SAT,
— Detailed engineering,
— Documentation.
The transformers are scheduled to be delivered to site approx. 2012-10-12 and commissioned 2012-12-15.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2011-06-10.
Upphandlingen offentliggjordes den 2011-05-13.
Vem?
Vad?
Var?
Upphandlingshistorik
Datum |
Dokument |
2011-05-13
|
Meddelande om upphandling
|