2021-07-097 + 3 Power Transformers up to 20MVA 50kV. Halland and Värmland (Ellevio AB)
Ellevio AB will order 7 power transformers to Värmland and Hallands län, located in the central western area of Sweden. The transformers will be connected to either 20, 34, 5 or 50 kV networks on the HV side and 10 kV on the LV side. Size will range from 6,3 to 20 MVA. Delivery time estimated Q4 2022. Additionally Ellevio want to have the possibility to order 3 optional transformers identical to the ones offered on the same contract.
Visa upphandlingen »
2021-01-11Sandlid, Ny 130/10 kV station (Borås Elnät AB)
Allmän information
Borås Elnät AB inbjuder intresserade leverantörer till anbudsansökan för prekvalificering för att lämna anbud på totalentreprenaden "Sandlid, Ny 130/10 kV station".
Borås Elnät AB avser att under 2021 - 2022 bygga en ny 130/10 kV station benämnd Sandlid, vilken ska ersätta den befintliga fördelningsstationen Sandlid (30/10 kV).
Förberedande markarbeten kommer att vara utförda där Beställaren lämnar en terrasserad yta uppfylld med sprängsten och krossmaterial till i …
Visa upphandlingen »
2021-01-08Krafttransformatorer till station Kristianstad Norra (C4 Elnät Aktiebolag)
Upphandlingen avser två stycken nya krafttransformatorer. som ska levereras till station Kristianstad Norra (KSD N) där en ny byggnad ska upprättas. Transformatorn ska placeras inomhus, men tillverkas för utomhusbruk. Märkdata enligt följande, dels: 55 +/- 8 x 1,67 % / 11 kV, 35/45 MVA (ONAN/ONAF), dels: 145 +/- 8 x 1,67 % / 11 kV, 35/45 MVA (ONAN/ONAF).
Visa upphandlingen »
2020-12-04Ramavtal för Nätstationer och transformatorer (Jönköping Energi Nät Aktiebolag)
Transformatorer och Nätstationer samt logistik och teknisk försäljning av ovanstående material till Jönköping Energi Nät AB:s (JENAB:s) verksamhet.
Utgångspunkt är dagens hantering där vi under avtalstiden går över till leveranser som uppfyller nya EU-direktiv för transformatorer som påverkar utformning av transformator och nätstationer.
Visa upphandlingen »
2020-11-27El-artiklar (Swedavia AB)
Swedavia avser att upphandla ett ramavtal med en leverantör avseende el sortiment för samtliga Swedavias flygplatser. Swedavia har behov av en leverantör med brett sortiment och väl utvecklad logistik för att möta verksamhetens dagliga behov. Leverantören skall kunna leverera inom produktgrupperna: Kabel, Elnätsprodukter, belysning,Installationsmateriel, Kraft och Automation samt, Data/Tele/Säkerhet
Leverans skall ske inom 24-48 timmar beroende på leveransort.
Upphandlingen syftar till att teckna avtal …
Visa upphandlingen »
2020-11-27Krafttransformatorer Värnamo Nordöstra (Värnamo Energi Aktiebolag)
Värnamo Elnät AB avser att bygga en ny 72,5/12 kV regionstation innehållande kontroll-, ställverks och transformatorbyggnad och två krafttransformatorer i anslutning till befintlig regionnätstation.
Denna upphandling avser att anbudsgivaren skall efter beställning från Värnamo Elnät AB leverera två Krafttransformatorer 72,5/12 kV, 16 MVA senast 2.5.2022 till driftfärdigt skick
Visa upphandlingen » Nämnda leverantörer:Helmerverken Holding AB
2020-10-30Krafttransformatorer (Kraftringen Nät AB)
Upphandling av 6 stycken krafttransformatorer.
Upphandlande enhet
Upphandlande enhet är Kraftringen Energi AB (publ) organisationsnummer 556100-9852, nedan kallat Kraftringen.
Upphandlingen omfattar även Kraftringens dotterbolag. Upphandlingen administreras av Kraftringens inköpsavdelning.Övriga avropsberättigade enheter:Skånska Energi Nät AB556497-5232Skattebergavägen 724734 Södra Sandy
Beskrivning av Kraftringen
Kraftringen är ett energibolag som ägs av de fyra skånska kommunerna Lund, Eslöv, Hörby och …
Visa upphandlingen »
2020-09-21Retrofit CHP Project – Electric Power Package (Stockholm Exergi AB)
The main parts of scope of supply include new high voltage breakers, new medium voltage switchgear, new low voltage switchgears including transformers for process equipment as well as electrical control system. As an option exchange of existing power and station transformers shall be included. The aim is to increase the Plant’s availability and to make it easy to operate and maintain. Please find and read enclosed documents in e-avrop (www.e-avrop.com) encompassing call for competition for Retrofit CHP …
Visa upphandlingen »
2020-09-09Mättransformatorer och plintar (Göteborg Energi Aktiebolag)
Upphandling mättransformatorer och plintar avsedda för debiteringsmätning på högspänning- och lågspänningsnät (12 kV samt 0,4 kV).
Allmän orientering
Upphandlingen avser mättransformatorer och plintar.
Göteborg Energi är i behov av att regelbundet köpa in mättransformatorer och plintar avsedda för debiteringsmätning på högspänning- och lågspänningsnät (12 kV samt 0,4 kV). Då inköpen är omfattande och regelbundna avses att upphandla ett ramavtal för denna typ av produkter.
Visa upphandlingen »
2020-09-02FFU 129.2 Prekvalificering nytt ställverk Gamleby fjärrvärmeverk (Västervik Miljö & Energi AB)
Förfrågan avser en totalentreprenad (ABT06) för nytt hög- och lågspänningsställverk, transformator samt reservkraft för kraftförsörjningsanläggningen på Gamleby fjärrvärmeverk. Entreprenören ska utifrån förfrågan projektera, upphandla, leverera, installera samt driftsätta en komplett ny kraftförsörjning för Gamleby fjärrvärmeverk.
Gamlebyverket är en fjärrvärmeanläggning som försörjer Gamleby med fjärrvärme, Årligen levererar Gamlebyverket ca 30 GWh fjärrvärme där med en toppeffekt på ca. 9 MW.
Visa upphandlingen »
2020-08-21Sandlid, Ny 130/10 kV station (Borås Elnät AB)
Allmän information
Borås Elnät AB inbjuder intresserade leverantörer till anbudsansökan för prekvalificering för att lämna anbud på totalentreprenaden "Sandlid, Ny 130/10 kV station".
Borås Elnät AB avser att under 2020 - 2022 bygga en ny 130/10 kV station benämnd Sandlid, vilken ska ersätta den befintliga fördelningsstationen Sandlid (30/10 kV).
Omfattning
Denna totalentreprenad omfattar allt arbete och material för att uppföra ny station Sandlid samt kompletteringsarbeten i Borås Elnäts stationer …
Visa upphandlingen »
2020-04-23Bodmyran Gubbaberget 5+5 Transformers (Ellevio AB)
Ellevio AB will order four 120 MVA power transformers to Bodmyran, and one 80 MVA power transformer to Gubbaberget, the locations are 100 km west of Sundsvall, Sweden. The transformers will be connected to the 145 kV network on the HV side and 36 kV on the LV side. Delivery time estimated Q2 2022. Additionally Ellevio want to have the possibility to order 5 optional transformers on the same contract. Sizes for the optional transformers will be 40-100 MVA. 4 of the optional transformers will be located …
Visa upphandlingen »
2020-04-03Tovåsen 750 + one optional 750 MVA Power transformer (Ellevio AB)
Ellevio AB will order one power transformer to Tovåsen, located 100 km west of Sundsvall, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Size 750 MVA. Delivery time estimated Q2 2022. Additionally Ellevio want to have the possibility to order one optional identical 750 transformer on the same contract.
Visa upphandlingen »
2019-11-066+3 Power Transformers for the Rural Network (Ellevio AB)
Ellevio AB will order 6 transformers for 2 new substations Skaftåsen and Sandnäs in central Sweden. The transformers will be connected to the 145 kV network on the HV side and 36 kV on the LV side. Size ranges from 63 to 130 MVA. Delivery on site early Q2 2021.
As options, Ellevio would like the possibility to order the following transformers: Two 80 MVA Transformers 145/36 kV + one additional 130 MVA 145/36 kV Transformer.
Visa upphandlingen »
2019-10-23Nätsstationer (Sollentuna Energi & Miljö Aktiebolag)
Leverans av kompletta transformatorstationen för uttag vid behov under avtalstiden. Omfattningen uppskattas till 3 - 6 transformatorstationer per år, men det styrs till stor del av externa exploatörer.
Antalet anges endast som vägledning för inköpens omfattning. Behovet kan komma att över- eller underskridas.
Visa upphandlingen »
2019-08-19Krafttransformatorer T1 och T2 Station M10 Övermo (Dala Energi Elnät AB)
Dala Energi Elnät AB avser att köpa in två nya krafttransformatorer (55/11 kV, 31,5/40 MVA) för att ersätta befintliga krafttransformatorer T1 och T2 i station M10 Övermo.
I sidoentreprenad upphandlas anslutning av primär- och sekundäranslutningar inkl. kontrollkablar och anpassning för uppställning och idrifttagning av nya krafttransformatorerna.
Denna upphandling omfattar uppställning och montage till driftfärdigt skick av de nya krafttransformatorerna. Anbudsgivaren skall efter beställning från …
Visa upphandlingen »
2019-07-05150 MVA Power Transformer to Sälen (Ellevio AB)
Ellevio AB will order 1 power transformer to substation Sälen, Sweden. The transformer will be connected to the 130 kV network on the HV side and 50 kV on the LV side. Size is 150 MVA. Delivery on site in Q3 2020.
Visa upphandlingen »
2019-07-04Inköp Krafttransformatorer (Luleå Energi Elnät AB)
Luleå Energi Elnät AB (LEEAB) avser att under 2020-21 förstärka matningen i station PT32 Notviken inkluderande två krafttransformatorer. 150/46/11,5 kV, 100/80/20 MVA till driftfärdigt skick.
Det ska finnas möjlighet att köpa ytterligare två krafttransformatorer 150/46/11,5 kV, 100/60/20 MVA till driftfärdigt skick.
Visa upphandlingen »
2019-06-05Transformer T3 (Markbygden Net AB)
Markbygden Net (MBN) cordially invites interested parties to apply for qualification to tender for a contract for the design, manufacture, supply and installation of one large transformer with 3 limbs, to be installed at the Råbäcken substation, located outside Piteå in northern Sweden. MBN’s grid connects local wind farms onto the national grid. MBN is currently planning to expand its grid to be able to connect more wind power production onto the national grid. This tender is part of that expansion.
MBN …
Visa upphandlingen »
2019-06-05Torpberget 750 MVA Power Transformer (Ellevio AB)
Ellevio AB will order 1 power transformer to Torpberget, located 60 km west of Ljusdal, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Size 750 MVA. Delivery time estimated Q2 2021.
Visa upphandlingen »
2019-05-24Olingan 500 MVA (Ellevio AB)
Ellevio AB will order 1 power transformers to Olingan, located 50 km south of Sveg, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Transformer size 500 MVA. Delivery time Q2 2021.
Visa upphandlingen »
2019-05-17Power Transformers — 500 MVA Olingan and Optional 750 MVA (Ellevio AB)
Ellevio AB will order 1 power transformers to Olingan, located 50 km south of Sveg, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Transformer size 500 MVA. Delivery time Q2 2021.
As option, Ellevio would like the possibility to order the following transformer:
— 1 power transformer to Torpberget, located 60 km west of Ljusdal, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Size 750 MVA. …
Visa upphandlingen »
2019-03-21DC Power Supplies (Lunds universitet)
Procurement of DC Power Supplies for the the 1.5 GeV storage ring at the MAX IV Laboratory — Lund University.
Scope of supply:
The supplier is required to provide all materials, equipment, tools, facilities and labor to perform the detailed engineering design, manufacturing and testing of turnkey DC Power Supply Systems (DCPSS) as per this technical specification. This work includes:
— testing and inspections and corresponding documentation,
— quality assurance/control documentation,
— operation and …
Visa upphandlingen »
2019-03-15RNS - Ombyggnation av transformatorstation Högdalen till 400/220 kV (Ellevio AB)
Ellevios luftisolerade 220kV ställverk i Högdalen söder om Stockholm ska förnyas och kompletteras med två stycken nya 400/220kV transformeringar á 750MVA. Se bifogat dokument " Projektbeskrivning Ombyggnation av Transformatorstation Högdalen" för en mer detaljerad beskrivning av leveransomfattningen.
Visa upphandlingen »
2019-01-172 + 4 Transformers to Rural Network (Ellevio AB)
Ellevio AB will order 2 power transformers to Svansåsen, located 200 km north of Karlstad, Sweden. The transformers will be connected to the 145 kV regional network on the HV side and 20 kV on the LV side. Transformer size 40 MVA. Delivery time Q2 2020–Q3 2020. As options, Ellevio would like the possibility to order up to 4 more transformers.
Visa upphandlingen »