Nyligen genomförda upphandlingar där leverantören Andritz Oy nämns
2023-05-24KVV2 - M02 Boiler and auxiliary equipment (Kraftringen Energi AB (publ))
The scope includes a biomass-fired steam boiler as a complete function based on fluid bed
technology (CFB or BFB) of approximately 110 MW thermal load with preliminary steam data of 80
bar(g) and 500°C including equipment as:
• Steam boiler with super heaters and economizer
• Inner fuel feeding including day silos
• Combustion air system with air pre-heaters
• Complete supporting steel structure including platforms and stairs
• Bottom ash handling and storage
• Auxiliary equipment such as feed water …
Visa upphandlingen » Nämnda leverantörer:Andritz OySumitomo SHI FWValmet Aktiebolag