2020-04-08   Pre-qualification Steam turbo generator for Lidköping Energi AB (Lidköping Energi AB)
Upphandling av ny ångturbin i storlek 5-10 MW till Lidköping Energi AB. Installation beräknas till vinter 2021. Visa upphandlingen »
Nämnda leverantörer: M+M Turbinen-Technik GmbH
2013-12-06   Steam turbogenerator, Nybro-Transtorp (Nybro Värmecentral AB)
Nybro Värmecentral. AB will build a new waste fired combined heat and power plant in Transtorp, Nybro. The plant is scheduled for commissioning for the winter season 2015/16. The new plant will be designed for a total thermal capacity of approximately 23 MW divided between 17 MW heat (2.100 GWh) and up to 6 MW (40 GWh) of electric power. The scope of this supply is a complete Turbogenorator set for this plant. Visa upphandlingen »
Nämnda leverantörer: M+M Turbinen-Technik GmbH