AB will build a new waste fired combined heat and power plant in Transtorp, Nybro. The plant is scheduled for commissioning for the winter season 2015/16.
The new plant will be designed for a total thermal capacity of approximately 23 MW divided between 17 MW heat (2.100 GWh) and up to 6 MW (40 GWh) of electric power.
The scope of this supply is a complete Turbogenorator set for this plant.