2022-05-02   Framework Agreement Seabed Survey (Vattenfall Vindrkraft AB)
Framework agreement for Offshore wind farms for scheduled and ad-hoc seabed surveys. Visa upphandlingen »
2019-03-05   Wind Turbine Blade Repair of Vattenfall Wind Farms (Vattenfall Vindkraft AB)
This tender concerns the wind turbine blade repair works for the employer’s existing assets across Europe from 1.1.2020 for a period of 24 months. The employer is Vattenfall being the owner and operator of wind turbine generators both Onshore and Offshore in the United Kingdom, Netherlands, Germany, Sweden and Denmark. The portfolio consists of multiple wind turbine generator platforms. Further details about the tender will be issued in the invitation to tender to qualified parties. Visa upphandlingen »
2018-12-21   Provision of a Generator and Power Conversion System (Minesto AB)
Minesto is continuing the development of the Deep Green Technology, by developing a micro grid tidal and ocean current power plant. For the next step we need a generator and power conversion system Visa upphandlingen »
2018-11-23   Main Components Supplies WTG (Vatttenfall Vindkraft AB)
This tender is intended to set up Framework Agreements for the future supply and delivery of WTG main components. Such components will be classified into three categories namely: (1) as-new; (2) refurbishment; and in special cases (3) brand new components. Visa upphandlingen »
2018-10-10   WTG Main Components Supplies (Vatttenfall Vindkraft AB)
This tender is intended to set up Framework Agreements for the future supply and delivery of WTG main components. Such components will be classified into 3 categories namely: 1) As-new; 2) Refurbishment and in special cases; 3) Brand new components. Visa upphandlingen »
2014-01-21   Wind Turbine Generator Installation package (Vattenfall Vindkraft A/S)
Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of between 390 MW to 410 MW and will consist of foundations, wind turbine generators and inter array cables. The total scope of works of this tender includes the offshore transport of the Wind Turbine Generator's (WTG's) from the port of pre-assembly to the Horns Rev 3 offshore construction site as well as the … Visa upphandlingen »