Beskrivning av alternativen
The Swedish EPA may call for an extension, with unchanged terms and conditions, by one year at the time of maximum 44 months. Total validity period of the contract including extension options is maximum to 31 december 2028. The Swedish EPA estimates that the amount of work per month during the option will be equal to that during the fixed term of the agreement.