The Farsta district heating plant was built in the late 50's and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with 1 new oil fired boiler, HOB. The new boiler will be fired with light fuel oil No 1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2016-10-07.
Upphandlingen offentliggjordes den 2016-09-07.
Meddelande om upphandling (2016-09-07) Objekt Upphandlingens omfattning
Titel: Fjärrvärmepanna
Referensnummer: UH-2016-72
Kort beskrivning:
The Farsta district heating plant was built in the late 50's and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with 1 new oil fired boiler, HOB. The new boiler will be fired with light fuel oil No 1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
The Farsta district heating plant was built in the late 50's and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with 1 new oil fired boiler, HOB. The new boiler will be fired with light fuel oil No 1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Fjärrvärmepanna📦
Ytterligare CPV-kod: Varmvattenpannor📦 Plats för genomförandet
NUTS-region: Stockholms län
🏙️
Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga
Referens Datum
Avsändningsdatum: 2016-09-07 📅
Sista anbudsdag: 2016-10-07 📅
Publiceringsdatum: 2016-09-10 📅
Identifierare
Meddelandenummer: 2016/S 175-314534
EUT-S-nummer: 175
Objekt Upphandlingens omfattning
Kort beskrivning:
The plant in Farsta is owned and operated by AB Fortum Värme samägt med Stockholms stad. The thermal rating is 95 MW fuel input. District heating temperature to the plant around 60°C and from the plant 115°C. Design data for mechanical design is Water side: 16 Bar(g)/120°C. The mechanical design needs to be selected such that the equipment is fitted in the available space in the existing building.
The plant in Farsta is owned and operated by AB Fortum Värme samägt med Stockholms stad. The thermal rating is 95 MW fuel input. District heating temperature to the plant around 60°C and from the plant 115°C. Design data for mechanical design is Water side: 16 Bar(g)/120°C. The mechanical design needs to be selected such that the equipment is fitted in the available space in the existing building.
The dimensions of the available space are: With: 9.6 meters, Height: 14.6 meters, Length: 15.7 meters
The boiler and flue gas fans shall be located within the available space.
The boiler will be installed during the 1st half of 2018.
Varaktighet: 18 månader
Beskrivning av alternativen: Possible option for 1 HOB boiler in Skarpnäck plant of Stockholm.
Plats för genomförandet
Huvudort eller plats för utförandet: Farsta plant in Stockholm.
Juridisk, ekonomisk, finansiell och teknisk information Villkor för deltagande
Behörighet att utöva yrkesverksamheten:
Registration certificate and a certificate showing that all tax obligations incl. social fees are fulfilled should also be submitted. The supplier shall fulfil requirements according to the act of public procurement in the utility sector, chapter 10§ 1 and 3.
Registration certificate and a certificate showing that all tax obligations incl. social fees are fulfilled should also be submitted. The supplier shall fulfil requirements according to the act of public procurement in the utility sector, chapter 10§ 1 and 3.
Ekonomisk och finansiell ställning:
Adequate financial and economic strength relative to the scope of the contract. The company should have documented good economy and the 2 latest annual reports should be submitted. Fortum Värme reserves the right to make a credit assessment of the tender. Indisputable legal status.
Adequate financial and economic strength relative to the scope of the contract. The company should have documented good economy and the 2 latest annual reports should be submitted. Fortum Värme reserves the right to make a credit assessment of the tender. Indisputable legal status.
Lägsta nivå(er) på standarder: A.
Teknisk och yrkesmässig förmåga:
The technical capacity with competence to build similar HOB. Function delivery of HOB should be proven and described with valid references not older than 5 years should be included. Knowledge and experience in comparable work and the ability to implement it.
The technical capacity with competence to build similar HOB. Function delivery of HOB should be proven and described with valid references not older than 5 years should be included. Knowledge and experience in comparable work and the ability to implement it.
List of reference from comparable projects, including the names and contact information for a reference person with the customer.
Kontraktets fullgörande
Depositioner och garantier som krävs: According to RFQ.
Förfarande
Språk på vilka anbud eller ansökningar om deltagande kan lämnas in: engelska 🗣️
svenska 🗣️
Anbudens giltighetstid: 2017-05-31 📅
Meddelande om tilldelning (2017-03-24) Objekt Upphandlingens omfattning
Kort beskrivning:
The Farsta district heating plant was built in the late fifties and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with one new oil fired boiler, HOB. The new boiler will be fired with light fuel oil no.1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
The Farsta district heating plant was built in the late fifties and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with one new oil fired boiler, HOB. The new boiler will be fired with light fuel oil no.1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
Meddelandeinformation
Dokumenttyp: Meddelande om tilldelning
Förfarande
Anbudstyp: Ej tillämpligt
Referens Datum
Avsändningsdatum: 2017-03-24 📅
Publiceringsdatum: 2017-03-28 📅
Identifierare
Meddelandenummer: 2017/S 061-114683
Refererar till meddelande: 2016/S 175-314534
EUT-S-nummer: 61
Objekt Upphandlingens omfattning
Kort beskrivning:
The thermal rating is 95 MW fuel input. District heating temperature to the plant around 60°C and from the plant 115°C. Design data for mechanical design is Water side: 16 Bar(g)/120°C. The mechanical design needs to be selected such that the equipment is fitted in the available space in the existing building.
The thermal rating is 95 MW fuel input. District heating temperature to the plant around 60°C and from the plant 115°C. Design data for mechanical design is Water side: 16 Bar(g)/120°C. The mechanical design needs to be selected such that the equipment is fitted in the available space in the existing building.
The dimensions of the available space are: With: 9,6 meters, Height: 14,6 meters, Length: 15,7 meters.
The boiler will be installed during the first half of 2018.
Tilldelning av kontrakt
Datum för avtalstecknande: 2017-03-24 📅
Källa: OJS 2017/S 061-114683 (2017-03-24)