Prequalification for modernization and conversion of burners

Fortum Värme samägt med Stockholms stad

General
This prequalification is for a turnkey contract that consists modernization and conversion of burners in four existing boilers, P11, P12, P13, P14, at Värtaverket, Stockholm.
The boilers shall be able to run on heavy oil (EO5), Bio oil (MFA) and Pitch oil (Boiler P14).
As general, the following applies:
— The delivery shall comply with the applicable regulations and policies. The necessary certificates, CE declarations and test certificate shall be included in the scope of delivery.
— Delivery terms NLM 10E with modifications by Fortum Heat Scandinavia.
Background, Steam automized
Boiler P11 and Boiler P12 are placed in heating plant 1 (Värmeverk 1) in Värtaverket, Stockholm. They are two EO5 fired hot water boilers from Götaverken built in 1969. The boilers are each equipped with 4 Babcock & Wilcox YEL(steam atomized) burners with a capacity at 3200kg/h per burner.
Boiler P13 and Boiler P14 are placed in heating plant 2 (Värmeverk 2) are two EO5 fired boile.

Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2015-05-18. Upphandlingen offentliggjordes den 2015-04-17.

Vem?

Vad?

Var?

Upphandlingshistorik
Datum Dokument
2015-04-17 Meddelande om upphandling