Kvantitet eller omfattning
The main elements covered by this scope are:—— Lot 1:— CFD analysis of incinerator/boiler system feeding system (option),— Waste chute (option),— Waste feeder - pusher (option) air system,— Secondary air fans nozzle and ducts incineration system,— Afterburning chamber,— Refractory,— Corrosion proof alloy cladding,— Updating of the combustion control boiler system,— New radiation part,— Boiler dome lift,— Water soot blowing, 1st and 2nd draught (option),— Sky climber/elevator, 1st and 2nd draught,— Disassembling of existing ECO-piping electrical equipment and CMS,— New high-voltage switchboards,— Electricity and CMS renovation for scope boiler hall,— Disassembly and remounting of the boiler hall.—— Lot 2:— Slag system,— The slag handling system shall be replaced,— The slag extractor shall be of the water filled and pusher type,— A vibrator conveyer shall be included,— A water overflow drain system shall be included.