Nyligen genomförda upphandlingar av installation av turbiner i Sverige
2016-10-10Steam turbine (Mälarenergi AB)
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the …
Visa upphandlingen »
2016-06-30Nya turbiner till Ålem Energi Kraft AB (Mönsterås kommun)
Härmed inbjuds Ni (Leverantören/Anbudssökande) att lämna anbudsansökan gällande en effektivisering/ombyggnation av det befintliga Skälleryds vattenkraftverk i Alsterån ca 8 km uppströms dess mynning i Östersjön, inom Mönsterås kommun.
Visa upphandlingen »
2016-03-07Prekvalificering av processentreprenörer för projekt P18 (Bodens Energi Aktiebolag)
Bodens Energi avser att utöka verksamheten med en ny linje för avfallsförbränning i det fortsatta benämnd P18. Den nya linjen kommer att integreras med befintlig verksamhet både mekaniskt, elektriskt och styrfunktionsmässigt. P18 kommer dock att installeras i eget hus, men kan komma att ha bränslemottagningen gemensam med befintlig panna P17. P18 kommer att upphandlas som 2-4 huvudentreprenader, varav en huvudentreprenad omfattar byggnaden och övriga huvudentreprenader omfattar processutrustningen.
Visa upphandlingen »
2015-07-08Steam turbine (Mälarenergi AB)
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 MWth for combustion of recycled wood fuel; A back-pressure steam turbine of about 55 MWe; A flue gas treatment system including flue gas condensation and combustion air moisturising system with condensate cleaning; A fuel handling system to supply the boiler with fuel. This procurement (Dnr …
Visa upphandlingen »
2013-07-01Major overhauls of both turbine G2 and generator, Värtaverket (AB Fortum Värme samägt med Stockholms stad)
During the summer of 2014 major overhauls of both turbine and generator are planned.
·The G2 steam turbine at Värtan plant is manufactured by ABB Stal, model ETME 56-25, with an electrical output of 120 MW and a district heating output of 205MW.
·The generator model is GTL1530 manufactured by ABB Generation.
·The turboset has been in operation more than 100 000 hours.
Visa upphandlingen »