2018-03-05   Frame agreement turbines / generator,Stockholm Exergi and Fortum (Stockholm Exergi AB)
Stockholm Exergi and Fortum Corporation intend to, for the Nordic, Baltic and Polish businesses, make framework agreements with suppliers with a capacity and capability for turbine and/or generator work. The frame work agreements will be used for call-offs of emergency work, scheduled work or project work as well as basis for mini-tender inquiries. If references, ESPD and all other requirements in the specifications are met you can submit a tender (we will not use an application day in the timeschedule). Visa upphandlingen »
2016-10-10   Steam turbine (Mälarenergi AB)
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the … Visa upphandlingen »
2016-07-11   Dnr 0222/16: 2 nya ångturbindrivna matarvattenpumpar, ca 2 x 900 kW (Renova Miljö AB)
Renova Miljö AB skall ersätta 2 befintliga turbindrivna matarvattenpumpar med 2 nya ångturbindrivna matarvattenpumpar, ca 2 x 900 kW. Upphandlingen omfattar att på totalentreprenad inom i handlingarna angivna gränser konstruera, tillverka, installera och driftsätta två (2) kompletta ångturbindrivna matarvattenpumpar. Renova kommer att tillhandahålla två (2) pumpar enligt bifogade handlingar. I entreprenaden skall allt arbete ingå och allt materiel (utöver de 2 pumpar som Renova tillhandahåller) som … Visa upphandlingen »
2016-03-07   Prekvalificering av processentreprenörer för projekt P18 (Bodens Energi Aktiebolag)
Bodens Energi avser att utöka verksamheten med en ny linje för avfallsförbränning i det fortsatta benämnd P18. Den nya linjen kommer att integreras med befintlig verksamhet både mekaniskt, elektriskt och styrfunktionsmässigt. P18 kommer dock att installeras i eget hus, men kan komma att ha bränslemottagningen gemensam med befintlig panna P17. P18 kommer att upphandlas som 2-4 huvudentreprenader, varav en huvudentreprenad omfattar byggnaden och övriga huvudentreprenader omfattar processutrustningen. Visa upphandlingen »
2015-12-07   Turbinrevision IKV 2017 (Söderenergi AB)
Söderenergi AB ägs av 3 kommuner söder om Stockholm, Södertälje, Botkyrka och Huddinge kommuner. Söderenergi producerar miljövänlig fjärrvärme för cirka 300 000 personer, industrier, kontor och sjukhus i våra ägarkommuner, samt el motsvarande förbrukningen i 100 000 hushåll. Företaget har 135 anställda och omsätter ca. 1,5 MDSEK. Intresseanmälan för anbudsgivning: Övergripande översyn av Beställarens Siemens ångturbin. Bakgrund: Turbinen driftsattes 2009 och har sedan dess blivit kontrollerad årligen med … Visa upphandlingen »
2015-07-08   Steam turbine (Mälarenergi AB)
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 MWth for combustion of recycled wood fuel; A back-pressure steam turbine of about 55 MWe; A flue gas treatment system including flue gas condensation and combustion air moisturising system with condensate cleaning; A fuel handling system to supply the boiler with fuel. This procurement (Dnr … Visa upphandlingen »
2014-12-22   KVV2 Lot: TUR (Eskilstuna Strängnäs Energi och Miljö Aktiebolag)
Procurement notification regarding a Steam Turbine for a complete new 100 MWth Combined Heat — and Powerplant to be erected in Eskilstuna, Sweden. Visa upphandlingen »
2013-07-01   Major overhauls of both turbine G2 and generator, Värtaverket (AB Fortum Värme samägt med Stockholms stad)
During the summer of 2014 major overhauls of both turbine and generator are planned. ·The G2 steam turbine at Värtan plant is manufactured by ABB Stal, model ETME 56-25, with an electrical output of 120 MW and a district heating output of 205MW. ·The generator model is GTL1530 manufactured by ABB Generation. ·The turboset has been in operation more than 100 000 hours. Visa upphandlingen »
2013-05-31   120 Ångturbin (Borås Energi och Miljö AB)
Prekvalificering av ångturbin. Visa upphandlingen »
2012-11-08   KV62 - E3 Steam Turbine (Tekniska Verken i Linköping AB (publ))
New waste incineration plant at Tekniska verken i Linköping AB (publ). Visa upphandlingen »
Nämnda leverantörer: Fincantieri
2011-12-16   Steam turbine for KVV8 CHP in Värtan (Fortum Värme samägt med Stockholms stad)
A CHP reheat steam turbine and generator with auxiliary systems. Offers can also be given for turbine plant (turbine island). Boiler size is about 300MW thermal (steam output). Visa upphandlingen »
2011-11-24   Prequalification new CHP Plant Sandvik 3 (Växjö Energi AB)
Main lot´s for a Combined Heat&Power plant. Visa upphandlingen »
2011-11-08   Kraftvärme Tallholmen E3 (Vimmerby Energi & Miljö AB)
Vimmerby Energi & Miljö AB planerar att uppföra ett kraftvärmeverk på 25-30 MW. Denna annonsering gäller en prekvalificering för Ångturbin med kringutrustning. Entreprenad E3 i bifogad beskrivning. Visa upphandlingen »
2011-04-14   2011.19 invitation to tender application turbine Mälarenergi (Mälarenergi AB)
Mälarenergi AB, Västerås, Sweden invites to tender application regarding the purchase of a steam turbine for district heat condensation of approximately 50 MW electricity. Visa upphandlingen »
2011-02-28   Kraftvärmeverk Transtorp (Nybro Värmecentral AB)
Upphandling av ett kraftvärmeverk bestående av panna, rökgasrening, ångturbin samt kringutrustning. Pannan ska eldas med utsorterat brännbart avfall. Visa upphandlingen »
2011-02-16   Prequalification of tenderers-Steam Turbogenerator-Västervik Miljö & Energi AB (Västerviks kommun)
VMEAB has decided to procure a SteamTurbogenerator. The purpose of this procurement is to pre-qualify relevant candidates for tendering in order to procure and provide VMEAB with a Steam Turbogenerator. The objective is to put the Steam Turbogenerator into service in Q4 2012. The assumed signing of contract is by Q2 2011. Visa upphandlingen »
Nämnda leverantörer: M+M Turbinen-Technik GmbH