Ellevio plans to connect a 750 MVA unit to the national transmission grid on HV side (400 kV) and to the regional grid on the LV side (140 kV). The 140 kV grid already has an existing connection point 400/140 kV, with a different phase angle. A possibility to correct the phase angle in this unit is needed in order to control the power flow to the 140 kV grid.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2023-01-15.
Upphandlingen offentliggjordes den 2022-12-07.
Meddelande om upphandling (2022-12-07) Objekt Upphandlingens omfattning
Titel: Kraftförsörjningstransformatorer
Referensnummer: UH-2022-119
Kort beskrivning:
“Ellevio plans to connect a 750 MVA unit to the national transmission grid on HV side (400 kV) and to the regional grid on the LV side (140 kV). The 140 kV...”
Kort beskrivning
Ellevio plans to connect a 750 MVA unit to the national transmission grid on HV side (400 kV) and to the regional grid on the LV side (140 kV). The 140 kV grid already has an existing connection point 400/140 kV, with a different phase angle. A possibility to correct the phase angle in this unit is needed in order to control the power flow to the 140 kV grid.
Visa mer Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Kraftförsörjningstransformatorer📦
Ytterligare CPV-kod: Kraftförsörjningstransformatorer📦 Plats för genomförandet
NUTS-region: Sverige🏙️
Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga