Beskrivning av upphandlingen
Ellevio AB will order 1 power transformer to Torpberget, located 60 km west of Ljusdal, Sweden. The transformer will be connected to the 420 kV network on the HV side and 145 kV on the LV side. Size 750 MVA. Delivery time estimated Q2 2021.