Bagage 2050, new baggage handling system, BHS (Bagage Handling System)

Swedavia AB

The current baggage handling systems in Stockholm Arlanda Airport North do not have sufficient capacity, flexibility or functionalities to meet the expected growth in traffic and new demands. As a consequence, Airport management has decided for the development of a completely new baggage handling system, a Project named ‘Baggage 2050’, being part of an overall Stockholm Arlanda development program. The new BHS shall be a state-of-the-art, future oriented, fully automatic sorting for departing, arriving and transfer baggage, in partially new or re-constructed buildings, and in a new pier, adapted to the overall Stockholm Arlanda development program. The new BHS shall be designed for more than 4 000 departing bags/ hour, plus arriving and transfer bag sand include systems for check-in and self-service bag drop, transport, sorting, bag store, planning, SCADA, monitoring, off-line training, operator workstations etc.

Sista ansökningsdag

Tidsfristen för mottagande av anbud var 2018-07-11. Upphandlingen offentliggjordes den 2018-06-05.

Vem? Vad? Var?
Upphandlingshistorik
Datum Dokument
2018-06-05 Meddelande om upphandling
Meddelande om upphandling (2018-06-05)
Objekt
Upphandlingens omfattning
Titel: Diverse transportutrustning och reservdelar
Referensnummer: SDA 2017-01147
Kort beskrivning:
The current baggage handling systems in Stockholm Arlanda Airport North do not have sufficient capacity, flexibility or functionalities to meet the expected growth in traffic and new demands. As a consequence, Airport management has decided for the development of a completely new baggage handling system, a Project named ‘Baggage 2050’, being part of an overall Stockholm Arlanda development program. The new BHS shall be a state-of-the-art, future oriented, fully automatic sorting for departing, arriving and transfer baggage, in partially new or re-constructed buildings, and in a new pier, adapted to the overall Stockholm Arlanda development program. The new BHS shall be designed for more than 4 000 departing bags/ hour, plus arriving and transfer bag sand include systems for check-in and self-service bag drop, transport, sorting, bag store, planning, SCADA, monitoring, off-line training, operator workstations etc.
Visa mer
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Byggentreprenader
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Diverse transportutrustning och reservdelar 📦
Ytterligare CPV-kod: Diverse transportutrustning och reservdelar 📦
Plats för genomförandet
NUTS-region: Sverige 🏙️

Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga

Upphandlande myndighet
Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Upphandlande myndighet (namn): Swedavia AB
Postadress: See below
Postnummer: 19045
Postort: Stockholm-Arlanda
Kontakt
Webbadress: https://www.swedavia.se/ 🌏
E-post: lennart.moberg@swedavia.se 📧
Telefon: +46 70-5591457 📞
URL för dokument: https://www.e-avrop.com/lfvall/e-Upphandling/NoticeLink.aspx?id=32020 🌏
URL för deltagande: https://www.e-avrop.com/lfvall/e-Upphandling/NoticeLink.aspx?id=32020 🌏

Referens
Datum
Avsändningsdatum: 2018-06-05 📅
Sista anbudsdag: 2018-07-11 📅
Publiceringsdatum: 2018-06-07 📅
Identifierare
Meddelandenummer: 2018/S 107-244673
Refererar till meddelande: 2018/S 037-081432
EUT-S-nummer: 107

Objekt
Upphandlingens omfattning
Kort beskrivning:
The current baggage handling systems in Arlanda North do not have sufficient capacity, flexibility or functionalities to meet the growth in traffic and new demands. As a consequence, Airport management has decided for the development of a complete new baggage handling system, a project that has been named “BHS 2050”, being part of an overall Arlanda development project.
Visa mer
The new BHS shall be a state-of-the-art future oriented fully automatic sorting for departing, arriving and transfer baggage, in partially new constructed and partially re-constructed buildings, and in the new pier, denoted “Pier G”, adapted to the different phases of the overall Arlanda development project execution. Focus is on flexible future solutions, and installation and testing is planned to be carried out from late 2022 to 2027.
Visa mer
The new BHS shall be designed for an ultimate capacity of more than 4 000 departing bags per hour, plus arriving and transfer bags, and shall have the operational throughput to facilitate semi and automatic loading in make-up.
The contract will among other things include.
— Check-in and self-service bag drop for standard bags, oversize and non-conveyable bags.
— Transport systems.
— Sorting for standard and oversize bags.
— Sorting bins, laterals and speed loaders.
— Make-up areas for transport to the aircraft.
— Transfer for standard and oversize bags.
— Manual encoding stations for bags without identity.
— Automatic Bag Store.
— High performance redundant IT cluster serving High level control system.
— Automatic departure and arrival planning system.
— SCADA system.
— Operational monitoring system including graphical dashboard.
— Reporting and analysing system.
— Off line simulation/training system.
— Operator workstations for the above systems.
— BIDS, Baggage information display system.
— Interface to existing T5 systems.
— Integration to the general airport systems via AODB.
— Fire doors and security doors.
— Integration of new Standard 3 HBS Hold Baggage Screening units (the HBS units).
Varaktighet: 96 månader
Beskrivning av alternativen: See procurement documents.
Plats för genomförandet
Huvudort eller plats för utförandet: Stockholm Arlanda Airport

Juridisk, ekonomisk, finansiell och teknisk information
Villkor för deltagande
Behörighet att utöva yrkesverksamheten: See procurement documents.
Förteckning och kortfattad beskrivning av regler och kriterier: See procurement documents.
Kontraktets fullgörande
Depositioner och garantier som krävs: See procurement documents.

Förfarande
Datum för avsändande av inbjudningar: 2018-09-14 📅
Språk på vilka anbud eller ansökningar om deltagande kan lämnas in: engelska 🗣️
Anbudens giltighetstid: 2019-10-31 📅

Upphandlande myndighet
Identitet
Nationellt registreringsnummer: 556797-0818
Kontakt
Kontaktpunkt: Lennart Moberg
URL för dokument: https://www.e-avrop.com/lfvall/e-Upphandling/NoticeLink.aspx?id=32020 🌏

Kompletterande information
Granskningsorgan
Namn: Förvaltningsrätten i Uppsala
Postadress: Box 1853
Postort: Uppsala
Postnummer: 751 48
Land: Sverige 🇸🇪
Telefon: +46 18-4316300 📞
E-post: forvaltningsratteniuppsala@dom.se 📧
Fax: +46 18-100034 📠
Webbadress: http://www.forvaltningsratteniuppsala.domstol.se 🌏
Källa: OJS 2018/S 107-244673 (2018-06-05)