Beskrivning av upphandlingen
Ellevio AB will install 2 new power transformer in the station Mosjön and 1 new transformer in the station Vilnästjärnen. Both stations are located about 20 km Northwest of Ockelbo, Sweden. The transformers will be connected to the 145 kV regional network on the HV side and 36 kV wind park connection on the LV side.
Quantity: 3 pcs.
Main characteristics: 140 ± 9 x 1,67 % / 33 kV 130 MVA.
Type: 3 phase, oil immersed with OLTC.
Delivery time: 15.5.2019.