Overhaul steam turbine/generator G1 Värtaverket, Stockholm

AB Fortum Värme samägt med Stockholms stad

Pre-qualification to participate the tendering process for turbine G1 KVV1:
Turbine and generator data:
Turbine: BBC type D3EYTT2i 250 manufactured by STAL LAVAL at licence 1975.
— Data: 177 bar/ 535oC.
— As district heating turbine 210 MWel/330 MWheat
— As condensing turbine 235 MWel.
Generator: ASEA Type GTH 1650 GK, manufactured 1975.
— Hydrogen cooled.
— 16,5 kV
— 284 MVA.

Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2016-12-15. Upphandlingen offentliggjordes den 2016-11-30.

Vem?

Vad?

Var?

Upphandlingshistorik
Datum Dokument
2016-11-30 Meddelande om upphandling