Heat and electricity is mainly produced by combustion of domestic and industrial waste in 5 steam boilers of 270 MWth together. Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2016-06-20.
Upphandlingen offentliggjordes den 2016-05-20.
Meddelande om upphandling (2016-05-20) Objekt Upphandlingens omfattning
Titel: Installation av ugnar för förbränning av avfall
Referensnummer: UH-2016-60
Kort beskrivning:
Heat and electricity is mainly produced by combustion of domestic and industrial waste in 5 steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Heat and electricity is mainly produced by combustion of domestic and industrial waste in 5 steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Referens Datum
Avsändningsdatum: 2016-05-20 📅
Sista anbudsdag: 2016-06-20 📅
Publiceringsdatum: 2016-05-24 📅
Identifierare
Meddelandenummer: 2016/S 098-175314
EUT-S-nummer: 98
Objekt Upphandlingens omfattning
Kort beskrivning:
Heat and electricity is mainly produced by combustion of domestic and industrial waste in 5 steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
The plant in Högdalen is owned and operated by AB Fortum Värme samägt med Stockholms stad. Heat and electricity is mainly produced by combustion of domestic and industrial waste in 5 steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system.
Dismantling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system.
The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
The company should have documented good economy and the 2 latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Juridisk, ekonomisk, finansiell och teknisk information Villkor för deltagande
Behörighet att utöva yrkesverksamheten:
Registration certificate and a certificate showing that all tax obligations incl. social fees are fulfilled should also be submitted. The supplier shall fulfil requirements according to the act of public procurement in the utility sector, chapter 10§ 1 and 3.
Registration certificate and a certificate showing that all tax obligations incl. social fees are fulfilled should also be submitted. The supplier shall fulfil requirements according to the act of public procurement in the utility sector, chapter 10§ 1 and 3.
Ekonomisk och finansiell ställning:
Adequate financial and economic strength relative to the scope of the contract. The company should have documented good economy and the 2 latest annual reports should be submitted. Fortum Värme reserves the right to make a credit assessment of the tender. Indisputable legal status.
Adequate financial and economic strength relative to the scope of the contract. The company should have documented good economy and the 2 latest annual reports should be submitted. Fortum Värme reserves the right to make a credit assessment of the tender. Indisputable legal status.
Teknisk och yrkesmässig förmåga:
The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included. Knowledge and experience in comparable work and the ability to implement it.
The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included. Knowledge and experience in comparable work and the ability to implement it.
List of reference from comparable projects, including the names and contact information for a reference person with the customer.
Kontraktets fullgörande
Depositioner och garantier som krävs: According to RFQ.
Förfarande
Språk på vilka anbud eller ansökningar om deltagande kan lämnas in: engelska 🗣️
svenska 🗣️
Anbudens giltighetstid: 2016-11-24 📅
Meddelande om tilldelning (2016-11-04) Objekt Upphandlingens omfattning
Kort beskrivning:
Heat and electricity is mainly produced by combustion of domestic and industrial waste in five steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismanteling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the two latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Heat and electricity is mainly produced by combustion of domestic and industrial waste in five steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismanteling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the two latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Meddelandeinformation
Dokumenttyp: Meddelande om tilldelning
Förfarande
Anbudstyp: Ej tillämpligt
Kriterier för tilldelning
Lägsta pris
Referens Datum
Avsändningsdatum: 2016-11-04 📅
Publiceringsdatum: 2016-11-08 📅
Identifierare
Meddelandenummer: 2016/S 215-391951
Refererar till meddelande: 2016/S 098-175314
EUT-S-nummer: 215
Objekt Upphandlingens omfattning
Kort beskrivning:
Heat and electricity is mainly produced by combustion of domestic and industrial waste in five steam boilers of 270 MWth together.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismanteling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the two latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Boiler P6 (91,2 MWth, 31,8 kg/s, 59 bar(g), 480 °C), a fluidised bed boiler (CFB) for industrial waste was put into operation in 1999. The economiser will be changed during revision in summer 2017 including new casing and sooting system. Dismanteling of old economiser, design, manufacturing and erection of new economiser together with new casing and sooting system. The company should have documented good economy and the two latest annual reports should be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled should also be submitted. The technical capacity with competence to build similar economiser with sooting system. Function delivery of economiser should be proven and described with valid references not older than 5 years should be included.
Tilldelning av kontrakt
Datum för avtalstecknande: 2016-10-04 📅
Källa: OJS 2016/S 215-391951 (2016-11-04)