Control System for Boiler 6 in Högdalen

Fortum Värme samägt med Stockholms stad

This prequalification is for a turnkey contract that consists of Pre- Engineering and Engineering of an upgrade reagrding existing DCS- system for the Boiler P6 at Högdalenverket in Stockholm, Sweden.
This plant was built in 1999 and consists of 3 different parts, Fuel, Boiler and Flue gas cleaning.
Fuel:
— The entrance of the fuel is a singular entry into 2 redundant storage silos. From these storage silos the fuel goes down to a singular conveyor into 3 different Day Silos. From these Silos the fuel is transported into the Boiler, on one conveyor for each silo.
Boiler:
— In the boiler there are 6 burners, 4 ignition burners and 2 EU-burners. The system also consists of Primary and Secondary fans and also there 3 high pressure fans. The feed water is built with two pumps where at least one of these two pumps has to be in use, to be able to run the Boiler. None of these systems are redundant.
Flue gas cleaning:
— Flue gas cleaning was delivered with a NID-solution, thats ne...

Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2015-07-07. Upphandlingen offentliggjordes den 2015-06-23.

Vem?

Vad?

Var?

Upphandlingshistorik
Datum Dokument
2015-06-23 Meddelande om upphandling
2015-06-25 Ytterligare upplysningar