150 MVA power transformer to Kläppa

Fortum

Fortum Distribution is installing a new transformer in an existing station outside Ljusdal , about 300 km north of Stockholm. The transformer will connect the national grid on 245 kV side and a region grid on 145 kV side.Coordinates:WGS 84 (lat, lon):N 61° 49.231, E 16° 7.234WGS 84 decimal (lat, lon):61.82052, 16.12057RT90:6856339, 1516629Electrical data: 150 MVA auto transformer, 245/145 kV.Cooling: To be optimized by the supplier. (water not allowed)Cooling equipment shall be hanged up on the transformer. Delivery time: 2013 or suppliers suggestion.

Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2013-01-31. Upphandlingen offentliggjordes den 2012-12-20.

Vem?

Vad?

Var?

Upphandlingshistorik
Datum Dokument
2012-12-20 Meddelande om upphandling
2013-01-24 Ytterligare upplysningar
2013-04-08 Meddelande om tilldelning