Fortum Distribution is installing a new transformer in an existing station outside Ljusdal , about 300 km north of Stockholm. The transformer will connect the national grid on 245 kV side and a region grid on 145 kV side.Coordinates:WGS 84 (lat, lon):N 61° 49.231, E 16° 7.234WGS 84 decimal (lat, lon):61.82052, 16.12057RT90:6856339, 1516629Electrical data: 150 MVA auto transformer, 245/145 kV.Cooling: To be optimized by the supplier. (water not allowed)Cooling equipment shall be hanged up on the transformer. Delivery time: 2013 or suppliers suggestion.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2013-01-31.
Upphandlingen offentliggjordes den 2012-12-20.
Vem?
Vad?
Var?
Upphandlingshistorik
Datum |
Dokument |
2012-12-20
|
Meddelande om upphandling
|
2013-01-24
|
Ytterligare upplysningar
|
2013-04-08
|
Meddelande om tilldelning
|