New coils to superheater II and eco II for boiler 3 in Högdalen

AB Fortum Värme samägt med Stockholms stad

The power plant in Högdalen is owned and operated by AB Fortum Värme samägt med Stockholms stad. Heat and electricity is produced in 6 steam boilers 270 MWth together. Boilers 1-4 and 6 are waste to energy boilers.
Boiler 3 is a WtE boiler from Martin Wehrlewerk and was put in to operation in 1986.
The Super Heater II and economizer II are original from 1986 and are worn out.
The coils shall be changed and economizer bends needs to be redesigned.
Overhaul is planned for September 2012.
Site visit prior to offer is mandatory.

Sista ansökningsdag

Tidsfristen för mottagande av anbud var 2011-09-28. Upphandlingen offentliggjordes den 2011-09-07.

Vem? Vad? Var?
Upphandlingshistorik
Datum Dokument
2011-09-07 Meddelande om upphandling
Meddelande om upphandling (2011-09-07)
Objekt
Upphandlingens omfattning
Titel: Anläggningsarbeten för värmekraftverk
Kvantitet eller omfattning: Design, manufacturing demolition and erection.
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Byggentreprenader
Reglering: Europeiska unionen
Gemensam upphandlingsterminologi (CPV)
Kod: Anläggningsarbeten för värmekraftverk 📦

Förfarande
Förfarandetyp: Selektivt förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Ospecificerat

Upphandlande myndighet
Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Postadress: Kvicksundsvägen 16
Postnummer: 124 59
Postort: Bandhagen
Kontakt
E-post: david.rona@fortum.com 📧
Telefon: +46 730571500 📞

Referens
Datum
Avsändningsdatum: 2011-09-07 📅
Sista anbudsdag: 2011-09-28 📅
Publiceringsdatum: 2011-09-13 📅
Identifierare
Meddelandenummer: 2011/S 175-287738
EUT-S-nummer: 175
Ytterligare information
Mandatory site visit latest October 14. Additional contactperson is Tomas Nilsson, tomas.k.nilsson@fortum.com, +46 730476053. Observe that required information according to section III shall be attached to request for invitation for tender. 3 to 6 contractors will be qualified for tender. Fortum Värme is a member of Sellihca prequalification system and vendor databas. For this and coming projects we are utilizing information from this database. If you are registred in Sellihca you do not have to submit economic, quality or environmental information. For further information contact us or Sellihca Qualification, P.O. Box 1817 Stoa, NO-4858 Arendal, Norway. Tel +47 37063530, or +46 84441728. www.achilles.com/sellihca ID: 10511-93748-2009. Type of procedure: restricted procurement. ID: 10511-133683-2011.
Visa mer

Objekt
Upphandlingens omfattning
Annonsen omfattar: Public_contract
Kort beskrivning:
The power plant in Högdalen is owned and operated by AB Fortum Värme samägt med Stockholms stad. Heat and electricity is produced in 6 steam boilers 270 MWth together. Boilers 1-4 and 6 are waste to energy boilers.
Boiler 3 is a WtE boiler from Martin Wehrlewerk and was put in to operation in 1986.
The Super Heater II and economizer II are original from 1986 and are worn out.
The coils shall be changed and economizer bends needs to be redesigned.
Overhaul is planned for September 2012.
Site visit prior to offer is mandatory.
Plats för genomförandet
Huvudort eller plats för utförandet: Högdalen plant in Stockholm.

Juridisk, ekonomisk, finansiell och teknisk information
Villkor för deltagande
Behörighet att utöva yrkesverksamheten:
To verify below conditions following documentations is asked for:
Latest annual financial report ? Company registration certificate or similar.
Certificate evidencing payment of taxes and social security contributions.
Information shall not be older than 3 months.
Ekonomisk och finansiell ställning:
Condition to be accepted as a deliverer and to get invitation for tender is:
Adequate financial and economical strength in relation to the scope of the contract. Fortum Värme reserves the right to make a credit control of the tenderer.
Unquestionable legal status. Knowledge and experience of comparable work and ability to carry it out. The supplier shall fulfill requirements according to the act of procurement in the utility sector, SFS 2007:1092 chapeter 10§3.
A tenderer affiliated to Sellihca does not need to enclose means of proof for legal and economical reports.
Teknisk och yrkesmässig förmåga:
List of reference from comparable projects, including name and contact information for a reference person with the client. No older than 3 years. Information of the suppliers own recourses for construction, manufacturing and installation alternatively reference to cooperators/ sub contractors for construction, manufacturing and installation.
Visa mer
Kontraktets fullgörande
Depositioner och garantier som krävs:
Contractor shall put out safety were a bank guarantee is represented.
It shall be approved by purchaser and be put out as "on demand".
Contractor shall put out safety in the event of repayment as contractor can be obligated to pay.
The warranty period is 2 years on materials and four years of function.
The facility must meet CE requirements and the EMC Directive.
De viktigaste finansieringsvillkoren och betalningsarrangemangen och/eller hänvisning till de relevanta bestämmelserna om dem: In our RFQ.
Juridisk form för den grupp av ekonomiska aktörer som ska tilldelas kontraktet: In our RFQ.
Andra särskilda villkor: In our RFQ.

Förfarande
Språk
Språk: engelska 🗣️
svenska 🗣️

Upphandlande myndighet
Identitet
Upphandlande myndighet (namn): AB Fortum Värme samägt med Stockholms stad
Huvudsaklig verksamhet: Production_transport_distribution_gas_heat
Kontakt
Kontaktpunkt: Inköp
David Rona
Namn: AB Fortum Värme samägt med Stockholms stad
Kontaktpunkt: Project engineering
Kurt Andersson
Telefon: +46 706691926 📞
E-post: kurt.g.andersson@fortum.com 📧

Referens
Datum
Startdatum: 2012-01-10 📅
Slutdatum: 2012-11-05 📅

Kompletterande information
Granskningsorgan
Information om tidsfrister för överprövning: 10 days after notification.
Källa: OJS 2011/S 175-287738 (2011-09-07)