Kort beskrivning
Stockholm Arlanda Airport has decided to reinvest in the aprons. The reinvestment will be done in several steps and include new stormwater piping, new system for aircraft fuel, new surface treatment and new PBBs.
The total investment will be done in 4 to 6 different phases.
This procurement will be based on Phase 1 and two options.
1.1.1 Phase 1 – Main Scope
? Noseloader type PBB for ten (10) stands, maximum code C aircrafts
? Two (2) Aprondrive type PBB for one (1) stand, maximum code E aircrafts
1.1.2 Phase 2 – Option 1
? Noseloader type PBB for 6 (six) stands
1.1.3 Phase 3 – Option 2
? Noseloader PBB for four (4) stands, maximum code C aircrafts
? Two (2) Aprondrive type PBB for one (1) stand, maximum code E-aircrafts