SwAM invites submission of tenders by suppliers who are able to deliver a rental contract in accordance with the conditions and specifications in this request for tenders including appendices. The Swedish Agency for Marine and Water Management (SwAM) has been tasked by the government to perform a trial with cameras and sensors on board fishing vessels so as to contribute towards fishing that is sustainable in the long term. This type of technique is called REM (Remote Electronic Monitoring) and we will use this term in this document. Following trial SwAM will provide answers to how future Swedish fisheries control could work and how work using REM needs to function in order to give the desired benefits in terms of compliance with the landing obligation. REM could also be a way for the fishing industry to demonstrate to the world at large how fishing is conducted. Installing REM on a vessel involves a disturbance to the day-to-day work of the crew, so it is important that the evaluation of future systems is done in collaboration with the fishing industry so that the equipment causes as little disruption on board as possible. The placing of cameras combined with the digital technology must, as far as possible, ensure that the crew is filmed as little as possible. The trial period for each vessel begins when the REM equipment has been installed and is operational and will then run for 12 months. The trial periods for different participating vessels may therefore start at different times. When the trial period is over, the equipment will be dismantled. The timings of installation and dismantling will be decided in dialogue between the fishing licence holder and SwAM.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2022-08-30.
Upphandlingen offentliggjordes den 2022-06-23.
Meddelande om upphandling (2022-06-23) Objekt Upphandlingens omfattning
Titel: Tjänster i samband med fiske
Referensnummer: 01071-2022
Kort beskrivning:
SwAM invites submission of tenders by suppliers who are able to deliver a rental contract in accordance with the conditions and specifications in this request for tenders including appendices.
The Swedish Agency for Marine and Water Management (SwAM) has been tasked by the government to perform a trial with cameras and sensors on board fishing vessels so as to contribute towards fishing that is sustainable in the long term. This type of technique is called REM (Remote Electronic Monitoring) and we will use this term in this document.
Following trial SwAM will provide answers to how future Swedish fisheries control could work and how work using REM needs to function in order to give the desired benefits in terms of compliance with the landing obligation. REM could also be a way for the fishing industry to demonstrate to the world at large how fishing is conducted.
Installing REM on a vessel involves a disturbance to the day-to-day work of the crew, so it is important that the evaluation of future systems is done in collaboration with the fishing industry so that the equipment causes as little disruption on board as possible. The placing of cameras combined with the digital technology must, as far as possible, ensure that the crew is filmed as little as possible.
The trial period for each vessel begins when the REM equipment has been installed and is operational and will then run for 12 months. The trial periods for different participating vessels may therefore start at different times. When the trial period is over, the equipment will be dismantled. The timings of installation and dismantling will be decided in dialogue between the fishing licence holder and SwAM.
SwAM invites submission of tenders by suppliers who are able to deliver a rental contract in accordance with the conditions and specifications in this request for tenders including appendices.
The Swedish Agency for Marine and Water Management (SwAM) has been tasked by the government to perform a trial with cameras and sensors on board fishing vessels so as to contribute towards fishing that is sustainable in the long term. This type of technique is called REM (Remote Electronic Monitoring) and we will use this term in this document.
Following trial SwAM will provide answers to how future Swedish fisheries control could work and how work using REM needs to function in order to give the desired benefits in terms of compliance with the landing obligation. REM could also be a way for the fishing industry to demonstrate to the world at large how fishing is conducted.
Installing REM on a vessel involves a disturbance to the day-to-day work of the crew, so it is important that the evaluation of future systems is done in collaboration with the fishing industry so that the equipment causes as little disruption on board as possible. The placing of cameras combined with the digital technology must, as far as possible, ensure that the crew is filmed as little as possible.
The trial period for each vessel begins when the REM equipment has been installed and is operational and will then run for 12 months. The trial periods for different participating vessels may therefore start at different times. When the trial period is over, the equipment will be dismantled. The timings of installation and dismantling will be decided in dialogue between the fishing licence holder and SwAM.
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Tjänster
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Tjänster i samband med fiske📦
Ytterligare CPV-kod: Tjänster i samband med fiske📦 Plats för genomförandet
NUTS-region: Västra Götalands län
🏙️
Förfarande
Förfarandetyp: Öppet förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga
Objekt Upphandlingens omfattning
Kort beskrivning:
SwAM invites submission of tenders by suppliers who are able to deliver a rental contract in accordance with the conditions and specifications in this request for tenders including appendices.
The Swedish Agency for Marine and Water Management (SwAM) has been tasked by the government to perform a trial with cameras and sensors on board fishing vessels so as to contribute towards fishing that is sustainable in the long term. This type of technique is called REM (Remote Electronic Monitoring) and we will use this term in this document.
The Swedish Agency for Marine and Water Management (SwAM) has been tasked by the government to perform a trial with cameras and sensors on board fishing vessels so as to contribute towards fishing that is sustainable in the long term. This type of technique is called REM (Remote Electronic Monitoring) and we will use this term in this document.
Following trial SwAM will provide answers to how future Swedish fisheries control could work and how work using REM needs to function in order to give the desired benefits in terms of compliance with the landing obligation. REM could also be a way for the fishing industry to demonstrate to the world at large how fishing is conducted.
Following trial SwAM will provide answers to how future Swedish fisheries control could work and how work using REM needs to function in order to give the desired benefits in terms of compliance with the landing obligation. REM could also be a way for the fishing industry to demonstrate to the world at large how fishing is conducted.
Installing REM on a vessel involves a disturbance to the day-to-day work of the crew, so it is important that the evaluation of future systems is done in collaboration with the fishing industry so that the equipment causes as little disruption on board as possible. The placing of cameras combined with the digital technology must, as far as possible, ensure that the crew is filmed as little as possible.
Installing REM on a vessel involves a disturbance to the day-to-day work of the crew, so it is important that the evaluation of future systems is done in collaboration with the fishing industry so that the equipment causes as little disruption on board as possible. The placing of cameras combined with the digital technology must, as far as possible, ensure that the crew is filmed as little as possible.
The trial period for each vessel begins when the REM equipment has been installed and is operational and will then run for 12 months. The trial periods for different participating vessels may therefore start at different times. When the trial period is over, the equipment will be dismantled. The timings of installation and dismantling will be decided in dialogue between the fishing licence holder and SwAM.
The trial period for each vessel begins when the REM equipment has been installed and is operational and will then run for 12 months. The trial periods for different participating vessels may therefore start at different times. When the trial period is over, the equipment will be dismantled. The timings of installation and dismantling will be decided in dialogue between the fishing licence holder and SwAM.
Beräknat totalt värde: 700 000 SEK 💰
Beräknat värde exklusive moms: 700 000 SEK 💰
Plats för genomförandet
Huvudort eller plats för utförandet: Västra Götalands län
Förfarande
Rättslig grund: 32014L0024
Tidpunkt för mottagande av anbud: 23:59
Språk på vilka anbud eller ansökningar om deltagande kan lämnas in: engelska 🗣️
Anbudens giltighetstid: 2022-11-30 📅
Datum för öppnande av anbud: 2022-08-31 📅
Tidpunkt för öppnande av anbud: 12:00