New fly ash transportation system for boiler 6 in Högdalen

AB Fortum Värme samägt med Stockholms stad

The cogeneration plant in Högdalen, Högdalenverket, is a waste to energy plant yearly burning about 750 000 tons of waste. The CFB (circulating fluidized bed) boiler P6, 91 MWth, was put into operation in 1999.
The flue gases from the boiler are cleaned by a dry and wet flue gas cleaning process. The plant was delivered by Alstom and the boiler with flue gas cleaning was put into operation in 1999.
Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the fly ash silo for boiler 6; 1 from economiser bottom (built in 2014) and 2 parallel lines from the fabric filter. There are also 2 parallel NID-reactors (NID=Novel Integrated Desulfurization) before the fabric filter with 2 ash senders connected to the pneumatic pipe system from the fabric filter. The NID system is not in operation at present and will not be included in the scope of supply with except for blocked pipe connections to NID-system.

Sista ansökningsdag

Tidsfristen för mottagande av anbud var 2017-10-15. Upphandlingen offentliggjordes den 2017-09-14.

Vem? Vad? Var?
Upphandlingshistorik
Datum Dokument
2017-09-14 Meddelande om upphandling
2018-03-08 Meddelande om tilldelning
Meddelande om upphandling (2017-09-14)
Objekt
Upphandlingens omfattning
Titel: Pneumatiska elevatorer eller transportörer
Referensnummer: UH-2017-142
Kort beskrivning:
The cogeneration plant in Högdalen, Högdalenverket, is a waste to energy plant yearly burning about 750 000 tons of waste. The CFB (circulating fluidized bed) boiler P6, 91 MWth, was put into operation in 1999. The flue gases from the boiler are cleaned by a dry and wet flue gas cleaning process. The plant was delivered by Alstom and the boiler with flue gas cleaning was put into operation in 1999. Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the fly ash silo for boiler 6; 1 from economiser bottom (built in 2014) and 2 parallel lines from the fabric filter. There are also 2 parallel NID-reactors (NID=Novel Integrated Desulfurization) before the fabric filter with 2 ash senders connected to the pneumatic pipe system from the fabric filter. The NID system is not in operation at present and will not be included in the scope of supply with except for blocked pipe connections to NID-system.
Visa mer
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Pneumatiska elevatorer eller transportörer 📦
Ytterligare CPV-kod: Panncentraler 📦
Plats för genomförandet
NUTS-region: Stockholms län 🏙️

Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga

Upphandlande myndighet
Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Upphandlande myndighet (namn): AB Fortum Värme samägt med Stockholms stad
Postadress: Kvicksundsvägen 16
Postnummer: 124 59
Postort: Bandhagen
Kontakt
Webbadress: http://www.fortum.com 🌏
E-post: david.rona@fortum.com 📧
Telefon: +46 73-0571500 📞
URL för dokument: https://www.e-avrop.com/forumvarme/e-Upphandling/NoticeLink.aspx?id=31900 🌏
URL för deltagande: https://www.e-avrop.com/forumvarme/e-Upphandling/NoticeLink.aspx?id=31900 🌏

Referens
Datum
Avsändningsdatum: 2017-09-14 📅
Sista anbudsdag: 2017-10-15 📅
Publiceringsdatum: 2017-09-16 📅
Startdatum: 2018-03-06 📅
Slutdatum: 2018-10-31 📅
Identifierare
Meddelandenummer: 2017/S 178-365305
EUT-S-nummer: 178

Objekt
Upphandlingens omfattning
Kort beskrivning:
The cogeneration plant in Högdalen, Högdalenverket, is a waste to energy plant yearly burning about 750 000 tons of waste. The CFB (circulating fluidized bed) boiler P6, 91 MWth, was put into operation in 1999.
The flue gases from the boiler are cleaned by a dry and wet flue gas cleaning process. The plant was delivered by Alstom and the boiler with flue gas cleaning was put into operation in 1999.
Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the fly ash silo for boiler 6; 1 from economiser bottom (built in 2014) and 2 parallel lines from the fabric filter. There are also 2 parallel NID-reactors
(NID=Novel Integrated Desulfurization) before the fabric filter with 2 ash senders connected to the pneumatic pipe system from the fabric filter. The NID system is not in operation at present and will not be included in the scope of supply with except for blocked pipe connections to NID-system.
(NID = Novel Integrated Desulfurization) before the fabric filter with 2 ash senders connected to the pneumatic pipe system from the fabric filter. The NID system is not in operation at present and will not be included in the scope of supply with except for blocked pipe connections to NID-system.
The wear and tear on the pneumatic system from fabric filter has been severe on pipes and silo inlets with frequent ash leakages affecting the environment and work health and safety as a consequence. The 2 parallel fly ash transportation lines from fabric filter to fly ash silo will now be exchanged including new ash senders, transportation pipes, booster valves, instrumental air connections, power supply installation and updated control system with programming and new process images in Purchaser's ABB 800XA boiler control system.
Visa mer
The present prequalification process is concerning a total function delivery (ABA99) of above mentioned scope of supply.

Juridisk, ekonomisk, finansiell och teknisk information
Villkor för deltagande
Behörighet att utöva yrkesverksamheten:
List and brief description of conditions:
Registration certificate and a certificate showing that all tax obligations incl. social fees are fulfilled should also be submitted.
Ekonomisk och finansiell ställning:
The company shall have documented good economy, to be stated in letter for prequalification, with sufficient financial resources and economic capacity to handle and secure the scope of supply. If contractor's company is recently started necessary capacity and economic resources during time of contract must be stated and guaranteed. The contractor's juridical status must also be without dubiety.
Visa mer
The 2 latest annual reports shall be submitted. Registration certificate and a certificate from tax authorities showing that all tax obligations are fulfilled shall also be submitted for prequalification as potential supplier.
Fortum Värme reserves the right to make a credit assessment of the tender. Indisputable legal status.
Tenderers may not be subject to any of the grounds for exclusion set out in Chapters 13, sections 1-2 and 4 §§ of the LUF.
Teknisk och yrkesmässig förmåga:
The technical capacity with competence to build complete similar plants shall be proven and described and valid references not older than 5 years shall be included. Fore references a customer contact person including contact details shall be stated for prequalification. Furthermore shall the contractor be certified for welding according to standard EN-ISO 3834-2 and have a quality management system based on standard ISO 9001 or equal.
Visa mer

Förfarande
Datum för avsändande av inbjudningar: 2017-10-26 📅
Språk på vilka anbud eller ansökningar om deltagande kan lämnas in: engelska 🗣️
svenska 🗣️
Anbudens giltighetstid: 2018-03-29 📅

Upphandlande myndighet
Identitet
Nationellt registreringsnummer: 556016-9095
Kontakt
Kontaktpunkt: David Rona
Adress till köparprofilen: http://www.fortum.com/countries/se/om-fortum/fortum-varme/pages/default.aspx 🌏
URL för dokument: https://www.e-avrop.com/forumvarme/e-Upphandling/NoticeLink.aspx?id=31900 🌏

Kompletterande information
Granskningsorgan
Namn: Förvaltningsrätten i Stockholm och migrationsdomstol
Postort: Stockholm
Postnummer: 115 76
Land: Sverige 🇸🇪
Telefon: +46 8-56168000 📞
E-post: forvaltningsrattenistockholm@dom.se 📧
Fax: +46 8-56168001 📠
Webbadress: http://www.forvaltningsrattenistockholm.domstol.se 🌏
Källa: OJS 2017/S 178-365305 (2017-09-14)
Meddelande om tilldelning (2018-03-08)
Objekt
Upphandlingens omfattning
Titel: Panncentraler
Kort beskrivning:
Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the fly ash silo for boiler 6; 1 from economiser bottom (built in 2014) and 2 parallel lines from the fabric filter. There are also 2 parallel NID-reactors (NID=Novel Integrated Desulfurization) before the fabric filter with two ash senders connected to the pneumatic pipe system from the fabric filter. The wear and tear on the pneumatic system from fabric filter has been severe on pipes and silo inlets with frequent ash leakages affecting the environment and work health and safety as a consequence. The 2 parallel. Fly ash transportation lines from fabric filter to fly ash silo will now be exchanged including new ash senders, transportation pipes, booster valves, instrumental air connections, power supply installation and updated control system with programming and new process images in purchaser's ABB 800XA boiler control system.
Visa mer
Meddelandeinformation
Dokumenttyp: Meddelande om tilldelning
Gemensam upphandlingsterminologi (CPV)
Kod: Panncentraler 📦

Förfarande
Anbudstyp: Ej tillämpligt
Kriterier för tilldelning
Lägsta pris

Upphandlande myndighet
Identitet
Upphandlande myndighet (namn): Stockholm Exergi AB
Kontakt
Webbadress: http://www.david.rona@stockholmexergi.se 📧
E-post: david.rona@stockholmexergi.se 📧

Referens
Datum
Avsändningsdatum: 2018-03-08 📅
Publiceringsdatum: 2018-03-10 📅
Identifierare
Meddelandenummer: 2018/S 049-109067
Refererar till meddelande: 2017/S 178-365305
EUT-S-nummer: 49

Objekt
Upphandlingens omfattning
Kort beskrivning:
Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the fly ash silo for boiler 6; 1 from economiser bottom (built in 2014) and 2 parallel lines from the fabric filter. There are also 2 parallel NID-reactors (NID=Novel Integrated Desulfurization) before the fabric filter with two ash senders connected to the pneumatic pipe system from the fabric filter. The wear and tear on the pneumatic system from fabric filter has been severe on pipes and silo inlets with frequent ash leakages affecting the environment and work health and safety as a consequence. The 2 parallel.
Visa mer
Fly ash transportation lines from fabric filter to fly ash silo will now be exchanged including new ash senders, transportation pipes, booster valves, instrumental air connections, power supply installation and updated control system with programming and new process images in purchaser's ABB 800XA boiler control system.
Visa mer
New fly ash system for Boiler 6.

Tilldelning av kontrakt
Datum för avtalstecknande: 2018-03-08 📅
Källa: OJS 2018/S 049-109067 (2018-03-08)