Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2016-11-08.
Upphandlingen offentliggjordes den 2016-10-10.
Meddelande om upphandling (2016-10-10) Objekt Upphandlingens omfattning
Titel: Ångpannor
Kvantitet eller omfattning:
This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen – inom ramen för avtalet om offentlig upphandling
Gemensam upphandlingsterminologi (CPV)
Kod: Ångpannor📦
Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga
Upphandlande myndighet Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Upphandlande myndighet (namn): Mälarenergi AB
Postadress: Box 14
Postnummer: 721 03
Postort: Västerås
Kontakt
Webbadress: http://www.malarenergi.se🌏
E-post: amil.misic@malarenergi.se📧
Telefon: +46 21395356📞
Referens Datum
Avsändningsdatum: 2016-10-10 📅
Sista anbudsdag: 2016-11-08 📅
Publiceringsdatum: 2016-10-14 📅
Identifierare
Meddelandenummer: 2016/S 199-359969
EUT-S-nummer: 199
Objekt Upphandlingens omfattning
Kort beskrivning:
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Referensnummer: Dnr 2016/41
Plats för genomförandet
Huvudort eller plats för utförandet: Västerås.
Meddelande om tilldelning (2017-08-22) Objekt Upphandlingens omfattning
Kort beskrivning:
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Meddelandeinformation
Dokumenttyp: Meddelande om tilldelning
Gemensam upphandlingsterminologi (CPV)
Ytterligare CPV-kod: Panncentraler📦 Plats för genomförandet
NUTS-region: Västmanlands län
🏙️
Förfarande
Anbudstyp: Ej tillämpligt
Referens Datum
Avsändningsdatum: 2017-08-22 📅
Publiceringsdatum: 2017-08-24 📅
Identifierare
Meddelandenummer: 2017/S 161-333044
Refererar till meddelande: 2016/S 199-359969
EUT-S-nummer: 161
Objekt Upphandlingens omfattning
Kort beskrivning:
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/41) relates to the purchase of one steam boiler of 150 — 180 MWth with steam parameters 91 bar(a) and 520°C including auxiliary systems. The fuel shall be recycled wood, i.e. wood waste (used wood) including demolition wood.
Tilldelning av kontrakt
Datum för avtalstecknande: 2017-06-22 📅
Kompletterande information Granskningsorgan
Namn: Förvaltningsrätten i Uppsala
Postort: Uppsala
Land: Sverige 🇸🇪
Källa: OJS 2017/S 161-333044 (2017-08-22)