Fuel handeling for KVV8 CHP in Värtan

Fortum Värme samägt med Stockholms stad

Fuel handling system for transporting, sieving and crushing biomass from unloading stations (from boat/railway) to a an intermediate storage and from storage to a boiler plant of about 300 MW thermal power (steam output). Included is also a coal handling system from an existing coal storage to the boiler and bed ash transport from the boiler to a bed ash silo.

Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2012-01-23. Upphandlingen offentliggjordes den 2011-12-16.