Fuel handeling for KVV8 CHP in Värtan
Fuel handling system for transporting, sieving and crushing biomass from unloading stations (from boat/railway) to a an intermediate storage and from storage to a boiler plant of about 300 MW thermal power (steam output). Included is also a coal handling system from an existing coal storage to the boiler and bed ash transport from the boiler to a bed ash silo.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2012-01-23.
Upphandlingen offentliggjordes den 2011-12-16.
Vem?
Vad?
Var?
Upphandlingshistorik
Datum |
Dokument |
2011-12-16
|
Meddelande om upphandling
|