420 kV Cable system Hagby-Anneberg

Svenska Kraftnät

Svenska Kraftnät received a commission in 2004 from the swedish government to investigate the future design of the national grid 70-400 kV in the area of Stockholm. The resulting report from the commission includes more than 50 projects. Some projects are based on 420 kV XLPE cable systems installed in ground or tunnels.
This qualification concerns design, manufacturing, testing, documentation and delivery of complete 420 kV XLPE cable system buried in soil for the project Hagby-Anneberg. Design, manufacturing, testing, documentation and installation of joints and cable terminations are also included. The scope concerns approximately 58 km 420 kV XLPE cable with 2 500 mm² copper conductor. Additionally an option will be asked, regarding an approximate cable lenght of 19 km.
Part deliveries and installations of joints and terminations are planned to take place during the period May 2012 - December 2013.

Sista ansökningsdag

Tidsfristen för mottagande av anbud var 2011-04-07. Upphandlingen offentliggjordes den 2011-03-11.

Vem? Vad? Var?
Upphandlingshistorik
Datum Dokument
2011-03-11 Meddelande om upphandling
Meddelande om upphandling (2011-03-11)
Objekt
Upphandlingens omfattning
Titel: Högspänningskabel
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen
Gemensam upphandlingsterminologi (CPV)
Kod: Högspänningskabel 📦

Förfarande
Förfarandetyp: Förhandlat förfarande
Anbudstyp: Anbud på alla delar
Kriterier för tilldelning
Ospecificerat

Upphandlande myndighet
Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Postadress: Box 1200
Postnummer: 172 24
Postort: Sundbyberg
Kontakt
E-post: rolf.axen@projectcraft.se 📧
Telefon: +46 702304426 📞

Referens
Datum
Avsändningsdatum: 2011-03-11 📅
Sista anbudsdag: 2011-04-07 📅
Publiceringsdatum: 2011-03-16 📅
Identifierare
Meddelandenummer: 2011/S 52-085747
EUT-S-nummer: 52
Ytterligare information
ID: 10542-125607-2011.

Objekt
Upphandlingens omfattning
Annonsen omfattar: Public_contract
Kort beskrivning:
Svenska Kraftnät received a commission in 2004 from the swedish government to investigate the future design of the national grid 70-400 kV in the area of Stockholm. The resulting report from the commission includes more than 50 projects. Some projects are based on 420 kV XLPE cable systems installed in ground or tunnels.
Visa mer
This qualification concerns design, manufacturing, testing, documentation and delivery of complete 420 kV XLPE cable system buried in soil for the project Hagby-Anneberg. Design, manufacturing, testing, documentation and installation of joints and cable terminations are also included. The scope concerns approximately 58 km 420 kV XLPE cable with 2 500 mm² copper conductor. Additionally an option will be asked, regarding an approximate cable lenght of 19 km.
Visa mer
Part deliveries and installations of joints and terminations are planned to take place during the period May 2012 - December 2013.
Referensnummer: 2011/361

Förfarande
Språk
Språk: engelska 🗣️

Upphandlande myndighet
Identitet
Upphandlande myndighet (namn): Svenska Kraftnät
Huvudsaklig verksamhet: Electricity
Kontakt
Kontaktpunkt: Rolf Axén
Källa: OJS 2011/S 052-085747 (2011-03-11)