Substructures: for substructures applies design and supply of the substructure of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Providing of foundation calculations. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents. Mechanical installation: for mechanical installation applies mounting of the substructure of free field solar power plants in accordance with current regulations. Unloading of the goods from the truck delivered by hardware suppliers. Piling and the working method should be based on risk analysis and evaluation, quality plans and safety studies. The installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents. Electrical installation (low voltage and high voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Sista ansökningsdag
Tidsfristen för mottagande av anbud var 2017-11-27.
Upphandlingen offentliggjordes den 2017-10-27.
Meddelande om upphandling (2017-10-27) Objekt Upphandlingens omfattning
Titel: Solkraftverk
Kvantitet eller omfattning:
The total value of this contract will depend on the number of projects Vattenfall will execute during the contract term and the tasks described in the individual scopes of work.
Meddelandeinformation
Originalspråk: engelska 🗣️
Dokumenttyp: Meddelande om upphandling
Kontraktets art: Varor
Reglering: Europeiska unionen
Gemensam upphandlingsterminologi (CPV)
Kod: Solkraftverk📦
Förfarande
Förfarandetyp: Selektivt förfarande
Anbudstyp: Anbud på en eller flera delar
Kriterier för tilldelning
Det ekonomiskt mest fördelaktiga
Upphandlande myndighet Identitet
Land: Sverige 🇸🇪
Upphandlande myndighet (typ): Allmännyttigt företag
Upphandlande myndighet (namn): Vattenfall AB
Postnummer: 162 87
Postort: Stockholm
Kontakt
E-post: ron.sperber@vattenfall.com📧
Telefon: +31 655697751📞
Referens Datum
Avsändningsdatum: 2017-10-27 📅
Sista anbudsdag: 2017-11-27 📅
Publiceringsdatum: 2017-10-31 📅
Identifierare
Meddelandenummer: 2017/S 209-435290
EUT-S-nummer: 209
Ytterligare information
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will make the relevant documents available only through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure:
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will make the relevant documents available only through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure:
Objekt Upphandlingens omfattning
Beräknat värde exklusive moms: 32 000 000 💰
50 000 000 💰
Kort beskrivning:
Substructures: for substructures applies design and supply of the substructure of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Providing of foundation calculations. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Substructures: for substructures applies design and supply of the substructure of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Providing of foundation calculations. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Mechanical installation: for mechanical installation applies mounting of the substructure of free field solar power plants in accordance with current regulations. Unloading of the goods from the truck delivered by hardware suppliers. Piling and the working method should be based on risk analysis and evaluation, quality plans and safety studies. The installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Mechanical installation: for mechanical installation applies mounting of the substructure of free field solar power plants in accordance with current regulations. Unloading of the goods from the truck delivered by hardware suppliers. Piling and the working method should be based on risk analysis and evaluation, quality plans and safety studies. The installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Electrical installation (low voltage and high voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Electrical installation (low voltage and high voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Mechanical installation: for mechanical installation applies mounting of the substructure of free field solar power plants in accordance with current regulations. Unloading of the goods from the truck delivered by hardware suppliers. The working method should be based on risk analysis and evaluation, quality plans and safety studies. The installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Mechanical installation: for mechanical installation applies mounting of the substructure of free field solar power plants in accordance with current regulations. Unloading of the goods from the truck delivered by hardware suppliers. The working method should be based on risk analysis and evaluation, quality plans and safety studies. The installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Electrical installation (low voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Electrical installation (low voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Beräknat värde exklusive moms: 6 000 000 💰
Delkontraktets nummer: 4
Delkontraktets titel: Lot 4: HV Electrical installation
Kort beskrivning:
Electrical installation (high voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Electrical installation (high voltage); for electrical installation applies design, supply, installation and commissioning of the electrical installation of free field solar power plants in accordance with current regulations. The working method should be based on risk analysis and evaluation, quality plans and safety studies. Also the installation will have to work for 20 years and Vattenfall accepts no chance of safety accidents.
Antal möjliga förlängningar: 2
Tidsram för efterföljande kontrakt: 24 månader
Varaktighet: 24 månader
Juridisk, ekonomisk, finansiell och teknisk information Villkor för deltagande
Ekonomisk och finansiell ställning:
Your company must have taken out liability insurance that at the time of application is valid for at least 6 more months, with a minimum cover of 3 000 000 EUR per event or you must provide for such insurance in case of contract award.
Teknisk och yrkesmässig förmåga: Detailed information in the Selection Guide on the Commerce-Hub website.
Kontraktets fullgörande
Depositioner och garantier som krävs: None.
De viktigaste finansieringsvillkoren och betalningsarrangemangen och/eller hänvisning till de relevanta bestämmelserna om dem: Detailed information in the Selection Guide on the Commerce-Hub website.
Juridisk form för den grupp av ekonomiska aktörer som ska tilldelas kontraktet: Detailed information in the Selection Guide on the Commerce-Hub website.
Andra särskilda villkor:
Detailed information in the Selection Guide on the Commerce-Hub website
Your organisation must be ISO 9001 certified or have a similar quality care system.
Förfarande
Maximalt antal operatörer i ramavtalet: 3
Ramavtalets längd i år: 2
Språk
Språk: engelska 🗣️