Nyligen genomförda upphandlingar av mekanisk hanteringsutrustning i Sverige
2017-09-14New fly ash transportation system for boiler 6 in Högdalen (AB Fortum Värme samägt med Stockholms stad)
The cogeneration plant in Högdalen, Högdalenverket, is a waste to energy plant yearly burning about 750 000 tons of waste. The CFB (circulating fluidized bed) boiler P6, 91 MWth, was put into operation in 1999.
The flue gases from the boiler are cleaned by a dry and wet flue gas cleaning process. The plant was delivered by Alstom and the boiler with flue gas cleaning was put into operation in 1999.
Fly ash from the boiler is today transported with three parallel pneumatic transportation systems to the …